Optimal schedule of a dairy manufactory
Summary: This paper deals with short-term scheduling of the dairy industry. Two different approaches are proposed for obtaining the minimal makespan schedules. According to the first, S-graph framework is proposed to find the optimal solution of the flow-shop scheduling problem. The problem is solve...
Permalink: | http://skupni.nsk.hr/Record/nsk.NSK01000736434 |
---|---|
Matična publikacija: |
Chemical and biochemical engineering quarterly 23 (2009), 2 ; str. 231-237 |
Glavni autor: | Adonyi, R. (-) |
Ostali autori: | Shopova, E. (-), Vaklieva-Bancheva, N. |
Vrsta građe: | Članak |
Jezik: | eng |
Predmet: | |
Online pristup: |
Chemical and Biochemical Engineering Quarterly |
Održavanje sustava u tijeku
Sustav je trenutačno nedostupan zbog održavanja.
Zapisi o posjedovanju i primjercima trenutačno nisu dostupni. Za više informacija kontaktirajte osoblje knjižnice ili pošaljite upit administratoru: