A preliminary estimate of time and cost in urban road construction using neural networks

Permalink: http://skupni.nsk.hr/Record/nsk.NSK01000880374/Details
Matična publikacija: Tehnički vjesnik (Strojarski fakultet)
20 (2013), 3 ; str. 563-570
Glavni autor: Peško, Igor (-)
Ostali autori: Trivunić, Milan (-), Cirović, Goran, Mučenski, Vladimir
Vrsta građe: Članak
Jezik: eng
Predmet:
Online pristup: Elektronička verzija članka
LEADER 01134naa a2200325 i 4500
001 NSK01000880374
003 HR-ZaNSK
005 20140616152058.0
007 ta
008 140611s2013 ci | |0|| ||eng
035 |a (HR-ZaNSK)000880374 
040 |a HR-ZaNSK  |b hrv  |c HR-ZaNSK  |e ppiak 
041 0 |a eng  |b hrv 
042 |a croatica 
044 |a ci  |c hr 
080 |a 624/625  |2 MRF 2011. 
080 |a 004  |2 MRF 2011. 
100 1 |a Peško, Igor 
245 1 2 |a A preliminary estimate of time and cost in urban road construction using neural networks /  |c Igor Peško, Milan Trivunić, Goran Cirović, Vladimir Mučenski. 
300 |b Ilustr. 
504 |a Bibliografija: 21 jed. 
504 |a Sažetak 
653 0 |a Gradske prometnice  |a Izgradnja  |a Troškovi izgradnje  |a Neuronske mreže 
700 1 |a Trivunić, Milan 
700 1 |a Cirović, Goran 
700 1 |a Mučenski, Vladimir 
773 0 |t Tehnički vjesnik (Strojarski fakultet)  |x 1330-3651  |g 20 (2013), 3 ; str. 563-570 
981 |b B04/13  |p CRO 
998 |a rpeo140611 
856 4 2 |u http://hrcak.srce.hr/index.php?show=clanak&id_clanak_jezik=153041  |y Elektronička verzija članka