Fuzzy cost modelling of diving chamber control measures under uncertainties

The diving chamber is an important system needed for diving operations in the oil and gas industry. Divers use it for various purposes. Thus, the safety level of the diving chamber needs to be very high at all times and the system needs to be in a good state. To achieve this, various control measure...

Full description

Permalink: http://skupni.nsk.hr/Record/nsk.NSK01001088726/Details
Matična publikacija: Pomorstvo (Online)
34 (2020), 2 ; str. 438-442
Glavni autori: Nwaoha, Thaddeus Chidiebere (Author), Emovon, Ikuobase
Vrsta građe: e-članak
Jezik: eng
Predmet:
Online pristup: https://doi.org/10.31217/p.34.2.24
Hrčak
LEADER 02022naa a22003614i 4500
001 NSK01001088726
003 HR-ZaNSK
005 20210301134315.0
006 m d
007 cr||||||||||||
008 210201s2020 ci d |o |0|| ||eng
024 7 |2 doi  |a 10.31217/p.34.2.24 
035 |a (HR-ZaNSK)001088726 
040 |a HR-ZaNSK  |b hrv  |c HR-ZaNSK  |e ppiak 
041 0 |a eng  |b eng 
042 |a croatica 
044 |a ci  |c hr 
080 1 |a 656  |2 2011 
080 1 |a 621  |2 2011 
100 1 |a Nwaoha, Thaddeus Chidiebere  |4 aut  |9 HR-ZaNSK 
245 1 0 |a Fuzzy cost modelling of diving chamber control measures under uncertainties  |h [Elektronička građa] /  |c Thaddeus Chidiebere Nwaoha, Ikuobase Emovon. 
300 |b Graf. prikazi. 
504 |a Bibliografija: 21 jed. 
504 |a Abstract. 
520 |a The diving chamber is an important system needed for diving operations in the oil and gas industry. Divers use it for various purposes. Thus, the safety level of the diving chamber needs to be very high at all times and the system needs to be in a good state. To achieve this, various control measures such as control measures 1 and 2 can be adopted in preventing failures/hazards or mitigate their consequences. In this study, fuzzy cost algorithm is used to estimate the cost of using control measures 1 and 2 in ensuring optimal operational level for the diving chamber, while the preference degree approach is adopted in prioritizing the aforementioned cost of control measures 1 and 2. The result of the analysis indicated that control measure 2 is the most cost effective approach. 
653 0 |a Ronioci  |a Ronilačka komora  |a Sigurnost  |a Troškovi  |a Naftna industrija  |a Plinska industrija 
700 1 |a Emovon, Ikuobase  |4 aut  |9 HR-ZaNSK 
773 0 |t Pomorstvo (Online)  |x 1846-8438  |g 34 (2020), 2 ; str. 438-442  |w nsk.(HR-ZaNSK)000663208 
981 |b Be2020  |b B02/20 
998 |b tino2103 
856 4 0 |u https://doi.org/10.31217/p.34.2.24 
856 4 0 |u https://hrcak.srce.hr/249037  |y Hrčak 
856 4 1 |y Digitalna.nsk.hr