A methodology for truck allocation problems considering dynamic circumstances in open pit mines, case study of the sungun copper mine

Permalink: http://skupni.nsk.hr/Record/nsk.NSK01001146998/Details
Matična publikacija: Rudarsko-geološko-naftni zbornik
31=34 (2019), 4(47) ; str. 57-65
Glavni autori: Moniri-Morad, Amin (Author), Pourgol-Mohammad, Mohammad, Aghababaei, Hamid, Sattarvand, Javad
Vrsta građe: Članak
Jezik: eng
Predmet:
Online pristup: Elektronička verzija članka
LEADER 01315naa a2200325 i 4500
001 NSK01001146998
003 HR-ZaNSK
005 20220831153000.0
007 ta
008 220831s2019 ci ad | |0|| ||eng
035 |a (HR-ZaNSK)001146998 
040 |a HR-ZaNSK  |b hrv  |c HR-ZaNSK  |e ppiak 
041 0 |a eng  |b hrv 
042 |a croatica 
044 |a ci  |c hr 
080 1 |a 51  |2 2011 
080 1 |a 622  |2 2011 
100 1 |a Moniri-Morad, Amin  |4 aut  |9 HR-ZaNSK 
245 1 2 |a A methodology for truck allocation problems considering dynamic circumstances in open pit mines, case study of the sungun copper mine /  |c Amin Moniri-Morad, Mohammad Pourgol-Mohammad, Hamid Aghababaei, Javad Sattarvand. 
300 |b Graf. prikazi, ilustr. 
504 |a Bibliografija i elektronički izvori: str. 63-65. 
504 |a Sažetak. 
653 0 |a Kamioni  |a Raspodjela kamiona  |a Optimizacija  |a Simulacija diskretnih događaja  |a Proizvodni kapacitet 
700 1 |a Pourgol-Mohammad, Mohammad  |4 aut  |9 HR-ZaNSK 
700 1 |a Aghababaei, Hamid  |4 aut  |9 HR-ZaNSK 
700 1 |a Sattarvand, Javad  |4 aut  |9 HR-ZaNSK 
773 0 |t Rudarsko-geološko-naftni zbornik  |x 0353-4529  |g 31=34 (2019), 4(47) ; str. 57-65  |w nsk.(HR-ZaNSK)000005674 
981 |b B17/19 
998 |b sapo2208 
856 4 1 |u https://hrcak.srce.hr/228201  |y Elektronička verzija članka